Municipal


Mesquite Municipal Cntr LEED control interface by CSC

Mesquite Municipal Center

Dallas

144,700 Sq. Ft.

Architect:

Brinkley Sargent

MEP:

ME Engineers

GC:

Lee Lewis

This LEED Certified, multi-phase, multi-use building houses the court house, police station and city hall. CSC provided all building automation to include several LEED specific items such as Carbon Dioxide monitoring, outside air monitoring and control, and humidity sensing and control. This phased project was accomplished with no disruption to governmental functions or services.

Control Systems Consultants

  • LEED: Silver
  • Web Based Graphical Interface
  • CO2
  • Outside Air Monitoring/Control


Municipal


White Rock Hills Library LEED & Monitoring by Control Systems

White Rock Hills Branch Library

Dallas

$4.5 Million

Architect:

HOK

MEP:

Powers MEP

GC:

JC Commercial Inc.

This state of the art, LEED certified facility is designed to house over 50,000 volumes for circulation. The building also includes, class rooms, meeting rooms and kitchen area. CSC provided a Johnson Control system to integrate with the Mitsubishi Variable Refrigerant Units. CSC further provided controls and all wiring for energy recovery and outside air ventilation and monitoring, ensuring that the LEED Silver rating was obtained.

Control Systems Consultants

  • LEED: Silver
  • Integrated With Mitsubishi Variable Refrigerant Units
  • Monitoring


Municipal


E. Texas Reg Airport Building Automation by Control Systems Consultants

East Texas Regional Airport

Longview

27,000 Sq. Ft.

$4,200,000

Architect:

Corgan

MEP:

KES

GC:

RWC Enterprises

To meet growing demand, Gregg County Commissioners approved expansion and upgrades of the East Texas Regional Airport in Longview, Texas. The Federal Aviation Administration funded 90% of the upgrades, while Gregg County provided the rest of the funding. Due to airport traffic, the expansion and renovations had to be phased over an 18 month period. CSC provided an open protocol Johnson Control Building Automation system for both new and existing equipment and established a fully integrated system.

Control Systems Consultants

  • Web Based Building Automation System
  • Fully Integrated System


Municipal


Water Treatment Plant Temperature Controls & Monitoring by CSC

Lake Lewisville Waste Water Treatment Plant

Denton

30,000+ Sq Ft.

Architect:

GAI

MEP:

Malcolm Pirnie

Waste Water Treatment is not only a critical part of environmental reclamation, but an every increasing priority for every day life in North Texas. Due to this demand, the City of Denton performed a complete upgrade on their Lake Lewisville Treatment facility. This type of project is one of the most complicated that a control contractor can perform. Aside from standard temperature controls involving pumps, VAV, VVTs, fan coil systems and exhaust systems, there are a variety of safety and environmental concerns that have to be monitored alarmed and controlled. These involve CO2, Chlorine, Ozone and a complete system interface via an upgraded Johnson Controls BACnet system.

Control Systems Consultants

  • Temperature Controls:
    • Pumps
    • VAVs
    • VVTs
    • Fan Coil System
  • Alarm Monitoring:
    • CO2
    • Chlorine
    • Ozone


Military


NASJRB - Johnson & Honeywell Automation Systems by CSC

Naval Air Station (NASJRB) - Multiple Projects

Fort Worth

500,000+ Sq Ft.

Mechanical Engineers (multiple):

Purdy-MgGurie
Naval Facilities
Engineering Command

GC (multiple):

LeeTex
Hill & Wilkinson
SMR
Walton

Commissioning Agents (multiple):

Questions & Answers
ECX

Mechanical Contractors (multiple):

City Wide Mechanical
Berger Engineering

Projects include Air Traffic Control Tower, Joint Intelligence, Joint Communications, 8th Marine Admin, Hangar 1058, Reception & welcome, multiple others. CSC prides itself on being one of the largest building automation contractors involved in the on-going construction & renovation projects one of the largest & most active reserve military facilities in the world. Currently the 3rd largest employer in North-Central Texas! CSC has consistently met and surpassed the stringent construction requirements per both NAVAC and USACOE.

Control Systems Consultants

  • Johnson & Honeywell Systems Per Facility Requirements
  • Mutiple central plants for new construction and existing upgrades
  • Controls For A Variety Of Systems:
    • Two-pipe Summer/Winter
    • VAV Systems
    • Constant Volume Systems
    • Variable Refrigerant Systems
  • Controls For Anti-biohazard UV Air Filtration Systems
  • UPS System Integration






Military


USAR Center  LEED  & Graphic interface by Control Systems Consultants

United States Army Reserve Center

Seagoville

105,000+ Sq Ft.

MEP:

Carter-Burgess/Jordan

Commissioning Agent:

ECX

GC:

Walton

This LEED rated multiple building facility was a critical need for the war-time training and combat deployment of many of Texas’s civilian soldiers. Home to the 90th Regional Readiness Command & 807th Medical Brigade, hundreds of soldiers from this base have been deployed to Afghanistan, Iraq and other areas in need of their special skills. CSC provided an open protocol Johnson Control building automation system with a web based graphic user interface. From LEED specific ventilation and CO2 requirements to a chilled water central plant, CSC worked with the Cx agents, mechanical contractor and US Army Corps of Engineers to ensure the LEED silver rating for this critical building.

Control Systems Consultants

  • LEED: Silver
  • Web Based Graphic User Interface
  • CO2 Ventilation
  • Central Plant